ID
7-508-1257
Name
Plant Utility Control Systems Team – Water Sector Infrastructure
Status
Published
Version
1.0
Updated
11/5/2019 9:23:28 AM
Original Release
11/05/2019
Last Major Release
11/05/2019
Description
The Plant Utility Control Systems Team – Water Sector Infrastructure restores and repairs supervisory control and data acquisition (SCADA) and radio telemetry systems
Resource Category
Public Works
Primary Core Capability
Infrastructure Systems
Secondary Core Capability
Resource Kind
Team
Overall Function
The Plant Utility Control Systems Team – Water Sector Infrastructure restores and repairs radio communications, SCADA, telemetry, plant control systems, and programmable logic controllers (PLC)
Composition and Ordering Specifications
1. Discuss logistics for deploying this team, such as working conditions, safety, length of deployment, security, lodging, transportation, and meals, prior to deployment
2. Requestor specifies human machine interface (HMI), PLC brand and model, mode of communication, and other unique requirements
3. Requestor orders mission-specific National Incident Management System (NIMS) Utility Worker Specialist – Water Sector Infrastructure personnel as single resources to supplement this team based on the equipment needing repair
4. Requestor specifies major repair components
5. Requestor provides external support, such as vehicle fuel and power for phones, computers, and other rechargeable devices
6. Requestor specifies any necessary safety qualifications and equipment
Supporting Core Capabilities |
---|
None |
Components | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Component | Notes | |||||||||||
MINIMUM PERSONNEL PER TEAM | Not Specified |
| ||||||||||
MANAGEMENT AND OVERSIGHT PERSONNEL PER TEAM | Requestor specifies the type of facility associated with the control systems and requests the corresponding team leader, whether NIMS Type 2 Water Operations Team Leader or NIMS Type 2 Wastewater Operations Team Leader. |
| ||||||||||
SUPPORT PERSONNEL PER TEAM | The NIMS Utility Worker Specialist – Water Sector Infrastructure can be a welder, electrician, or mechanic. Requestor specifies worker specialty based on mission needs. |
| ||||||||||
CAPABILITY PER TEAM | Requestor specifies types of communications infrastructure, SCADA software, and other control specifications. |
| ||||||||||
CAPABILITY EQUIPMENT PER TEAM | 1. Equipment includes a full complement of industry-specific tools necessary for the repairs indicated, such as power tools and hand tools. 2. For the Type 1 and Type 2 bucket truck, requestor specifies working height. |
| ||||||||||
PERSONAL PROTECTIVE EQUIPMENT (PPE) PER TEAM MEMBER | PPE is mission-specific and may vary by work environment; it includes protective footwear, protective clothing for skin exposure, eye and ear protection, respirators, gloves, and masks. |
| ||||||||||
Electronics Equipment Per Team | Other appropriate software includes operating system, word processing, spreadsheet, and database management programs. |
| ||||||||||
COMMUNICATIONS EQUIPMENT PER TEAM | 1. Consider alternate forms of communication, such as satellite phones, based on the mission assignment and team needs. 2. Requestor provides radio specifications. 3. Provider supplies necessary chargers and backup batteries for battery-powered portable equipment. |
| ||||||||||
TRANSPORTATION EQUIPMENT PER TEAM | Vehicle must be capable of traversing rough terrain, flood conditions, and adverse environmental conditions, and must carry equipment necessary for maintaining vehicle operation. |
|
Notes |
---|
References |
---|
Reference |
FEMA, NIMS 509: Supervisory Control and Data Acquisition Specialist |
FEMA, NIMS 509: Utility Worker Specialist – Water Sector Infrastructure |
FEMA, NIMS 509: Water Operations Team Leader |
FEMA, NIMS 509: Wastewater Operations Team Leader |
FEMA, National Incident Management System (NIMS), October 2017 |
FEMA, National Response Framework, June 2016 |