ID
7-508-1145
Name
Repair and Start-Up Team Water Pump Facilities – Water Production
Status
Published
Version
1.5
Updated
11/5/2019 9:14:37 AM
Original Release
03/26/2013
Last Major Release
11/05/2019
Description
The Repair and Start-Up Team Water Pump Facilities – Water Production repairs water pump facilities
Resource Category
Public Works
Primary Core Capability
Infrastructure Systems
Secondary Core Capability
Resource Kind
Team
Overall Function
The Repair and Start-Up Team Water Pump Facilities – Water Production assesses and repairs water pump facilities of all types and sizes, including intake facilities, raw water conveyance facilities, treatment plants, and pump stations. This team does not repair intake facilities that require boats, nor does it repair structural damage and other large-scale damage.
Composition and Ordering Specifications
1. Discuss logistics for deploying this team, such as working conditions, safety, length of deployment, security, lodging, transportation, and meals, prior to deployment
2. Requestor orders additional mission-specific National Incident Management System (NIMS) Utility Worker Specialist – Water Sector Infrastructure personnel, such as mechanics, welders, electricians, and repair technicians, as single resources to supplement this team
3. Requestor provides details about types of pump facilities needing assessment and repair expertise, as well as any materials responders should provide
4. Requestor specifies control systems in use, such as electronic, pneumatic, or hydraulic
5. Requestor specifies facility capacity in millions of gallons per day (MGD)
6. Requestor specifies types of pumps needing repair
7. Requestor provides external support, such as vehicle fuel and power for phones, computers, and other rechargeable devices
8. Requestor specifies any necessary safety qualifications and equipment, such as confined-space entry, trenching, and shoring capabilities
| Supporting Core Capabilities |
|---|
| None |
| Components | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Component | Notes | |||||||||||
| Minimum Personnel Per Team | Not Specified |
| ||||||||||
| Management And Oversight Personnel Per Team | Not Specified |
| ||||||||||
| SUPPORT PERSONNEL PER TEAM | The NIMS Utility Worker Specialist – Water Sector Infrastructure can be a welder, electrician, or mechanic. Requestor specifies worker specialty based on mission needs. |
| ||||||||||
| Pump Repair Capability Per Team | Requestor provides specifics on pumps needing repair. |
| ||||||||||
| Specialized Equipment Per Team | Equipment includes a full complement of industry-specific tools necessary for repairs, such as power tools, hand tools, and pumps. |
| ||||||||||
| Personal Protective Equipment (PPE) Per Team Member | PPE is mission-specific and may vary by work environment; it includes protective footwear, protective clothing for skin exposure, eye and ear protection, respirators, gloves, and masks. |
| ||||||||||
| Electronics Equipment Per Team | Appropriate software includes word processing, spreadsheet, and database management programs. |
| ||||||||||
| Communications Equipment Per Team | 1. Consider alternate forms of communication, such as satellite phones, based on the mission assignment and team needs. 2. Requestor provides radio specifications. 3. Provider supplies necessary chargers and backup batteries for battery-powered portable equipment. |
| ||||||||||
| Transportation Equipment Per Team | 1. Vehicles must be capable of traversing rough terrain, flood conditions, and adverse environmental conditions, and must carry equipment necessary for maintaining vehicle operation. 2. Vehicle must have a tow hitch with diverse attachment capabilities. 3. Crane comes with qualified operator. |
| ||||||||||
| Notes |
|---|
| References |
|---|
| Reference |
| FEMA, NIMS 509: Utility Worker Specialist – Water Sector Infrastructure |
| FEMA, NIMS 509: Water Operations Team Leader |
| FEMA, National Incident Management System (NIMS), October 2017 |
| FEMA, National Response Framework, June 2016 |
| Published Versions | ||
| Version | Publish Date | Document Type |
|---|---|---|
| 1.5 | 11/5/2019 9:14:37 AM | |
| 1.4 | 9/28/2018 5:06:39 PM | |
| 1.3 | 4/8/2016 9:14:32 AM | |
| 1.2 | 8/11/2014 9:13:57 PM | Unavailable |
| 1.1 | 4/8/2014 6:22:30 PM | Unavailable |
| 1.0 | 12/12/2013 5:41:09 PM | Unavailable |